Skip to navigationSkip to content

Projets

Industrial

Hydro-Québec’s 315/25-kV Bélanger Substation

Transport

1999-2005 Montreal-Trudeau International Airport expansion

Jodoin Lamarre Pratte architectes - Agrandissement majeur de l'aéroport International Montréal-Trudeau 2005-2009
Transport

2005-2009 Montreal-Trudeau International Airport expansion

All projects (Industrial)

Major repairs and redevelopment of STM’s subway stations
Transport
Montréal350 M$2018
Preliminary draft for the extension of the blue line of the Montréal metro
Transport
Montréal1,5 G$2017
Hydro-Québec’s 315/25-kV De Lorimier Substation
Industrial
Montréal115 M$2017
Hydro-Québec’s 315/25-kV Henri-Bourassa Substation
Industrial
Montréal45 M$2014

Subscribe to Newsletter

JodoinRigour
LamarreCreativity
PratteCollaboration
ArchitectesKnowledge