![]() |
CHSLD Bordeaux-Cartierville |
![]() |
Montreal Pierre-Elliot Trudeau International Airport |
![]() |
Selwyn House School |
![]() |
faculté de médecine vétérinaire, université de montréal |
![]() |
St-Eustache Hospital |
![]() |
Université de Montréal, Marcelle-Coutu pavilion |
![]() |
MUHC - Master Architecture and Mountain Site |
![]() |
University of Montreal marcelle-coutu pavilion |
![]() |
Maisonneuve-Rosemont Hospital |
![]() |
Ste. Anne's Hospital |
![]() |
vieux terrebonne theater |
![]() |
Hospital Charles-Lemoyne |
![]() |
Hospital Centre - Phase 1 |
![]() |
csss memphremagog CH, CLSC, CHSLD |
![]() |
Hôpital Général Juif radio-oncologie et hall d'entrée |
![]() |
Inst. of medical sciences + holistic therapies |
![]() |
Charles-LeMoyne Hospital, emergency unit |
![]() |
university of sherbrooke |
![]() |
St. Joseph's Oratory |
![]() |
ADM - Air France Lounge |
![]() |
Hôpital de Sorel - Urgence |
![]() |
institut des procédés industriels |
![]() |
raymond-lévesque Library |
![]() |
Dolbeau-Mistassini Theatre |
![]() |
ADM - v.i.p. lounge |
![]() |
jodoin lamarre pratte headquarters |
![]() |
Purvinituq Primary School |
![]() |
université de montréal - cité du savoir de laval |
![]() |
chum - hémodynamie |
![]() |
cité de la santé de laval - radio-oncology |
![]() |
complexe de diagnositic vétérinaire et d'épidémiosurveillance |
![]() |
Jewish General Hospital, Paediatric Psychiatry |
![]() |
Collège de Rosemont, CEGEP @ Distance ce |
![]() |
MUHC Research Centre |
![]() |
réfection édifice john-wiliam-hopkins |
![]() |
hôpital général juif, pavillon des soins critiques |
![]() |
église saint-paul de aylmer |
![]() |
Residence: Grey Nuns of Montreal |
![]() |
Collège de Maisonneuve, bibliothèque Gabriel C. Allard |
![]() |
université laval: concours du 50e : ajout manifeste |
![]() |
hôtel-dieu: mansard roof renovation |
![]() |
place-des-arts: réparation du plafond |
![]() |
chu ste-justine |
![]() |
ADM - aménagement des bureaux de la Surété et DTI dans l'aérogare |
![]() |
maison de radio-canada in montreal |
![]() |
concours plan maître 'eje bulnes', santiago de chili |
![]() |
Marriott Residence Inn Downtown Montréal |
Extension of the 38-stretcher emergency unit.
This two-level project takes place on the basement and main floor, an area of the hospital delineated by the existing blocs B and C, and by rue Saint-Charles. The total raw area of the extension and restructuring comprises 6 875m2. The extension includes the expansion of the main floor emergency unit, while the equipment room, drop-off zones and loading docks will be located in the basement. This extension allows for the erecting of two floors to house laboratories on Level 1 and the surgical unit on Level 2, and a mechanical room is foreseen for Level 3. The existing buildings are set 3m higher than Saint-Charles and Taschereau boulevards. This slope poses a significant constraint on the implementation of the extension and its geometry, and has therefore become the determining factor delineating the limits of the side and rear boundaries of the extension, the position of the emergency entrances, ambulance and delivery areas. The extension is at the core of a complex development process, as it evolved in tandem with the creation of CICM, the integration of a 25 KV electrical room, the design of a pathology department on the roof of the existing emergency unit, the development of amenities on additional levels and the construction of multi-level parking. The project will take place in one phase, but will necessitate a series of steps, cascading spaces and temporary loading docks to ensure the building continues to operate smoothly during the work.
Project carried out in consortium: Leclerc and associates | Jodoin Lamarre Pratte and associated architects in consortium
Project date: 2004 to 2010
Surface Area: 6875m2
Budget: $26.5 M
Team Members: Lead architect, Michel Broz. Team: Robert Sindon, Karina Morin
Role: Early analysis, preliminary concept, plans and specifications, construction services.
project date : 2004 to 2010
surface area : 6875m2
budget : 26.5 M$
team : Architectes responsable, Michel Broz, , Membres de l’équipe :, Robert Sindon, Karina Morin